2019-04-28 AllStarLink Board Meeting Minutes
Jump to navigation
Jump to search
ASL Board Meeting Minutes
28-April-2019 – Dave Shaw
Meeting called to order @ 08:00
Meeting adjourned @ 08:37
Board members present:
Pete Elke PETim Sawyer TS
Dave Shaw DS
Absent:
Todd Lesser TLMike Wolthuis MWKevin Custer KC
- Official Actions
- Adoption of 2019.04.07 Board meeting minutes. (Pete proposed, Tim seconded))
- TS made motion, KC seconded (unanimous)
- Admin group report (TS)
- TS, no updates, SLACK has been quiet.
- Registration issue is priority (no updates this week)
- TS, no updates, SLACK has been quiet.
- SEAL technical items (TS)
- Per Bryan, remaining items to decommission SEAL remain with Stacy re: SSL certs synchronizations.
- Allstar Community (TS)
- TS requested new node sign up or node request include the option to include a link to community.
- Hosting resources cost ()
- Need generic specifications needed for any future site (MW has action)
- Paying for SLACK Google etc. environment (no update)
- DS applied for TechSoup (SLACK & Google suite).
- IRS letter needed to complete TechSoup application (TL has action).
- Issuing new Node numbers (TS)
- Announcement for the list has been created and is ready to send
- TS reported alpha test on portal was made available to admin’s
- Next action, pick a roll out date
- White paper is posted in wiki
- Tim created a graph of node number issues and new user sign ups. Run rate.
- 1000 left in 40000 block have about 5 months of capacity left at current run rate.
- Peter requested a report depicting unused node numbers below 50000
- Treasurer's report: (DS)
- PayPal balance: $2304.04 (2019.04.28) ($1000 transfer by Todd)
- Bank balance $1524.96
- RTCM FW (Trimble 4/06 Thunderbolt rollover) (TS)
- 2019.04.28 no update
- Mike worked with Chuck to get RTCM fixed code compiled and had “Alpha” version out for testing.
- Long term solution pending (update to chan.voter)
- Systems with Thunderbolts stayed up through the rollover.
- Repack (KC)
- CM119B issue, KC received formal application notes.
- Issues remain with CM119B support related to internal settings (work continues)
- Outstanding update to URIxb schematic (resistor values) by Kevin communicated to Dave K.
- Florida Non-Profit annual report needs filing with sunbiz.org before 1-May-2019 (KC forwarded from Steve Z)
- (DS to look at what is needed in the report)
- Board to review and approve prior to filing
- Peter has action to contact Todd
- Bryan requested that we retrieve the disk from the SEAL server. KC has connection to Quadranet.
- Will a dd over ssl satisfy Bryan’s request?