2019-06-24 AllStarLink Board Meeting Minutes
Jump to navigation
Jump to search
ASL Board Meeting Minutes
2019.06.24 – Dave Shaw
Meeting called to order @ 18:00 PDT
Meeting adjourned @ 19:29 PDT TL motion, PE seconded.
Board members
Present:
Tim Sawyer TS
Dave Shaw DS
Todd Lesser TLKevin Custer KCPete Elke PE
Absent:
Mike Wolthuis MW
- Official Actions
- Adoption of 2019.05.19 Board meeting minutes. (Pete made motion to adopt, Tim seconded)
- PS made motion, KC seconded (unanimous)
- Admin group report (MW)
- MW not available, no updates, carry to next meeting.
- SEAL technical items (MW, TS)
- Per Bryan, remaining items to decommission SEAL remain with Stacy re: SSL certs synchronizations.
- TS, an updated list of to-do’s has been created in gdrive.
- Allstar Community (TS)
- TS lots of traffic
- 300-600 views per day. Good SEO.
- TS encouraged everyone else (on the board) to join in.
- Hosting resources cost (2019.06.24 open)
- Need generic specifications needed for any future site (MW has action)
- MW will work on some sort of formalized agreements with our current providers.
- Paying for SLACK Google etc. environment (TechSoup 501c3 validated)
- DS applied for TechSoup (Next steps)?
- DS will investigate slack discounts via techsoup or just 501c3.
- DS to investigate how to apply for Google via TechSoup.
- Issuing new Node numbers (TS)
- Getting low adoption of NNX testers.
- PE: Optional make people to subdivide when new nodes requested.
- PE requests we hold off supporting 440xxx node numbers for now.
- PE lets carry this topic for further discussion of vanity numbering.
- Treasurer's report: (DS)
- PayPal balance: $2195.40 (2019.06.24)
- Bank balance $463.71 (2019.06.24)
- RTCM FW (Trimble 4/06 Thunderbolt rollover) (TS)
- Systems with Thunderbolts stayed up through the rollover.
- TS reached out to Chuck on why didn’t it fail?
- Repack (KC)
- CM119B issue, KC received formal application notes.
- New developer will work on code changes necessary for re-pack to support for CM119B chip.
- (closed) Florida Non-Profit annual report needs filing with sunbiz.org before 1-May-2019 (KC forwarded from Steve Z)
- TL completed Sunbiz submission
- DS submitted IRS documentation
- Bryan requested that we retrieve the disk from the SEAL server. KC has connection to Quadranet.
- Will a dd over ssl satisfy Bryan’s request?
- New business:
- Moving meeting back to Sunday @08:00 PDT